Publish Time: 2026-07-06 Origin: Site
When a machine is finished on the production line, our work isn't over. In many ways, it's just beginning.
Today, our engineers are testing a BGA Rework Station, carefully checking machine performance, verifying system settings, and making fine adjustments. Every function is tested to make sure the equipment is ready for stable operation before it leaves our factory.
This is not a special process for one machine. It is the same standard we follow for every piece of equipment we build. Whether it's an SMT machine, DIP equipment, a conformal coating machine, or a complete production line, every machine goes through careful inspection, calibration, and performance testing before shipment.
We believe customers should spend their time producing quality products—not troubleshooting new equipment. That's why our engineers prefer to find and solve every possible issue before the machine is delivered.
Behind every shipment is a team that pays attention to the details. Every inspection is another step toward helping our customers start production faster and with greater confidence.
At I.C.T, reliable equipment begins with responsible engineering. No matter what machine we're building, the inspection standard always stays the same.